Envusa Energy


240 MW Solar Plant
Project in joint venture with CEEC and CGGC

This will close in 0 seconds

EDF Renewables


115MW Solar Plant with BESS
Project in joint venture with CEEC and CGGC

This will close in 0 seconds

Tharisa


Tharisa
Comprehensive execution of SMPP and EC&I works on the Vulcan Plant that entailed

  • Structural Steel: 1,484 tonnes of steelwork detailed, fabricated and erected
  • Mechanical Installations: 265 major items
  • Piping:
    9 km of carbon steel and 8 km of HDPE piping
    63,700 dia. inches welded
    579 radiographic tests (RTs) with a repair rate of 0.7%
  • Electrical & Instrumentation:
    136 km of MV, LV and C&I cabling
  • Tanks:
    34 tanks (shop-fabricated and site-erected)
  • Support Works:
    Extensive Scaffolding and Thermal Insulation

This project required high-performance integration of mechanical and electrical disciplines, delivering fast track progress and quality at scale.

This will close in 0 seconds

Tronox


Tronox
SMPP works for a mineral sands plant in KZN.

This will close in 0 seconds

Thyssenkrupp


Thyssenkrupp
Thyssenkrupp
Comprehensive execution of critical inspection, fabrication, and installation works in a high-spec, hazardous environment:

  • Steelwork:
  • Piping Installation including welding,
    Post-Weld Heat Treatment (PWHT),
    Penetrant Tests (PT),
    Magnetic Particle Tests (MT),
    Radiographic Tests (RT),
    Hardness Verifications (HV).
  • Mechanical Scope:
    Installation of tanks and associated equipment
  • Support Services:
    Full Scaffolding and Thermal Insulation provision

A high-integrity turnaround project delivered with precision, safety, and uncompromising quality under strict statutory and environmental controls.

This will close in 0 seconds

Natref


Natref

Steam Boilers
SMPP and EC&I works for three new steam boilers at Natref refinery in Sasolburg

This will close in 0 seconds

Mogale


Mogale

Mogale

A full-scope SMPP and EC&I project, delivering critical infrastructure for a gold tailings retreatment plant:

  • Structural Steel:
    843 tonnes of steel detailed, fabricated and erected
  • Mechanical Installations:
    Full suite of process plant equipment. 503 items of mechanical equipment were installed.
  • Piping:
    20 km of carbon steel, stainless steel, and HDPE piping
  • Platework & Tanks:
    Precision-fabricated platework
    6 large tanks (shop- rolled plate and site-erected)
  • Electrical & Instrumentation:
    240 km of cabling (MV, LV, and C&I)
    Full installation of racking, cables, switchgear, and commissioning
  • Scaffolding &, Insulation and Heat Tracing:
    Safe access and thermal protection and preservation solutions

A turnkey delivery of a modern gold processing plant, built for reliability, scale, and long-term value in the gold mining sector.

This will close in 0 seconds

Impala Platinum


Impala Platinum
Flash Dryer No.8 – Rustenburg
Integrated Mechanical, Structural & Electrical Execution
End-to-end delivery of Structural, Mechanical, and Electrical & Instrumentation works for a modern dryer unit at Impala’s facility in Rustenburg:

  • Structural Scope:
    170 tonnes of steelwork fabricated and erected
    550-tonne silo: complete fabrication and site erection
  • Mechanical Works:
    Installation of all dryer-related mechanical equipment
  • Electrical & Instrumentation:
    Full MV, LV, and C&I installation

A turnkey execution combining steelwork, mechanicals, and integrated electrical systems in a high-demand processing environment.

This will close in 0 seconds

Foskor


Secondary Hoppers Reconstruction, Structural Recovery & Reinforcement for Safe Plant Restart

  • Emergency Response:
    Demolished and safely removed collapsed steelwork and platework caused by structural failure.
  • Accuracy:
    Detailed site measurements, followed by fast-track fabrication and installation of replacement structures to restore plant functionality.
  • Upgrades & Reinforcement:
    Identified and replaced additional corroded steelwork to eliminate safety risks and ensure long-term structural integrity.

A rapid, fast-paced recovery project executed to restore operations safely and minimize plant downtime.

This will close in 0 seconds

Sepcoiii


Sepcoiii

Redstone Concentrated Solar Plant – Postmasburg
Structural Execution for Next-Generation Renewable Energy Infrastructure

Erection of critical plant infrastructure for one of South Africa’s flagships CSP projects:

  • Steelwork:
    1,700 tonnes of structural steel erected
  • Piping:
    Pipe fabrication

A high-performance package contributing to the success of a cutting-edge concentrated solar power facility.

This will close in 0 seconds

Eskom


Port Rex Peaking Station (East London):
Replacement of Stacks

This will close in 0 seconds

Mpact


Mpact

Sodium Sulphate Plant – Piet Retief
Complete Electrical & Instrumentation Installation

Full-scope EC&I works, supporting the commissioning of a high-efficiency chemical processing facility:

  • Cabling:
    114 km of MV, LV, and control cable installed
  • Power Systems:
    Installation of MCCs, transformers, and generators
  • Electrical Fit-Out:
    Full lighting and small power systems
  • Instrumentation:
    Installation of process instrumentation

A technically complex EC&I package delivered to specification, ensuring operational readiness for plant start-up.

This will close in 0 seconds

Mitsubishi Hitachi Power Systems


Mitsubishi Hitachi Power Systems

Kusile Power Station (Boilers and PJFF):
Pre-Assembly & Erection of Boiler Structural Steel including on-site modifications, mechanical and electrical work.

  • 32 000 t of steel preassembled
  • 10 700 welds on 4 x PJFFs
  • LV electrical work
  • Scaffolding & Insulation

This will close in 0 seconds

GE


Kriel Power Station (Kriel):
Stator Repairs. Mechanical & Electrical work.

Kusile WFGD (Kendal):
Scope of work included the pre-assembly and installation of structural steel, installation of mechanical equipment, and cladding/sheeting.

  • Rope Access Technicians
    were utilized for torquing structural connections at height, reducing reliance on scaffolding and elevated mobile access platforms.
  • Quantities Installed:
    1,521 tons of structural steel
    4,463 m² of cladding
    22 mechanical equipment items
  • Modifications to the Absorbers (Unit 6):
    The roof was modified by cutting and removing deformations, followed by re-welding and Non-Destructive Testing (NDT).
    Arc strikes inside the tank were removed, surface scars repaired, and NDT performed.
  • The vertical and horizontal welds on the inside were ground to specification in preparation for internal rubber lining.

This will close in 0 seconds

Murray & Roberts


Multi Petroleum Fuel Storage Facility (Heidelberg)
Installation of Spiral Staircases and Diffuser Piping:

  • Spiral staircases were installed to 10no of fuel storage tanks in accordance with API 650
  • 500NB and 450NB Diffuser Pipes were installed inside the fuel storage tanks

This will close in 0 seconds