Contact Us

Together we will complete your project, from Blueprint to Reality

MEI Construction & Services (Pty) Ltd

Phone

(011) 450 0119

GPS Coordinates

S: 26° 10′ 20″, E: 28° 08′ 00″

Registration Number

2024/460062/07

Physical Address

Unit 7, Bedfordview Office Park, 3 Riley Road, Bedfordview

Send us a message

    Envusa Energy


    240 MW Solar Plant
    Project in joint venture with CEEC and CGGC

    This will close in 0 seconds

    EDF Renewables


    115MW Solar Plant with BESS
    Project in joint venture with CEEC and CGGC

    This will close in 0 seconds

    Tharisa


    Tharisa
    Comprehensive execution of SMPP and EC&I works on the Vulcan Plant that entailed

    • Structural Steel: 1,484 tonnes of steelwork detailed, fabricated and erected
    • Mechanical Installations: 265 major items
    • Piping:
      9 km of carbon steel and 8 km of HDPE piping
      63,700 dia. inches welded
      579 radiographic tests (RTs) with a repair rate of 0.7%
    • Electrical & Instrumentation:
      136 km of MV, LV and C&I cabling
    • Tanks:
      34 tanks (shop-fabricated and site-erected)
    • Support Works:
      Extensive Scaffolding and Thermal Insulation

    This project required high-performance integration of mechanical and electrical disciplines, delivering fast track progress and quality at scale.

    This will close in 0 seconds

    Tronox


    Tronox
    SMPP works for a mineral sands plant in KZN.

    This will close in 0 seconds

    Thyssenkrupp


    Thyssenkrupp
    Thyssenkrupp
    Comprehensive execution of critical inspection, fabrication, and installation works in a high-spec, hazardous environment:

    • Steelwork:
    • Piping Installation including welding,
      Post-Weld Heat Treatment (PWHT),
      Penetrant Tests (PT),
      Magnetic Particle Tests (MT),
      Radiographic Tests (RT),
      Hardness Verifications (HV).
    • Mechanical Scope:
      Installation of tanks and associated equipment
    • Support Services:
      Full Scaffolding and Thermal Insulation provision

    A high-integrity turnaround project delivered with precision, safety, and uncompromising quality under strict statutory and environmental controls.

    This will close in 0 seconds

    Natref


    Natref

    Steam Boilers
    SMPP and EC&I works for three new steam boilers at Natref refinery in Sasolburg

    This will close in 0 seconds

    Mogale


    Mogale

    Mogale

    A full-scope SMPP and EC&I project, delivering critical infrastructure for a gold tailings retreatment plant:

    • Structural Steel:
      843 tonnes of steel detailed, fabricated and erected
    • Mechanical Installations:
      Full suite of process plant equipment. 503 items of mechanical equipment were installed.
    • Piping:
      20 km of carbon steel, stainless steel, and HDPE piping
    • Platework & Tanks:
      Precision-fabricated platework
      6 large tanks (shop- rolled plate and site-erected)
    • Electrical & Instrumentation:
      240 km of cabling (MV, LV, and C&I)
      Full installation of racking, cables, switchgear, and commissioning
    • Scaffolding &, Insulation and Heat Tracing:
      Safe access and thermal protection and preservation solutions

    A turnkey delivery of a modern gold processing plant, built for reliability, scale, and long-term value in the gold mining sector.

    This will close in 0 seconds

    Impala Platinum


    Impala Platinum
    Flash Dryer No.8 – Rustenburg
    Integrated Mechanical, Structural & Electrical Execution
    End-to-end delivery of Structural, Mechanical, and Electrical & Instrumentation works for a modern dryer unit at Impala’s facility in Rustenburg:

    • Structural Scope:
      170 tonnes of steelwork fabricated and erected
      550-tonne silo: complete fabrication and site erection
    • Mechanical Works:
      Installation of all dryer-related mechanical equipment
    • Electrical & Instrumentation:
      Full MV, LV, and C&I installation

    A turnkey execution combining steelwork, mechanicals, and integrated electrical systems in a high-demand processing environment.

    This will close in 0 seconds

    Foskor


    Secondary Hoppers Reconstruction, Structural Recovery & Reinforcement for Safe Plant Restart

    • Emergency Response:
      Demolished and safely removed collapsed steelwork and platework caused by structural failure.
    • Accuracy:
      Detailed site measurements, followed by fast-track fabrication and installation of replacement structures to restore plant functionality.
    • Upgrades & Reinforcement:
      Identified and replaced additional corroded steelwork to eliminate safety risks and ensure long-term structural integrity.

    A rapid, fast-paced recovery project executed to restore operations safely and minimize plant downtime.

    This will close in 0 seconds

    Sepcoiii


    Sepcoiii

    Redstone Concentrated Solar Plant – Postmasburg
    Structural Execution for Next-Generation Renewable Energy Infrastructure

    Erection of critical plant infrastructure for one of South Africa’s flagships CSP projects:

    • Steelwork:
      1,700 tonnes of structural steel erected
    • Piping:
      Pipe fabrication

    A high-performance package contributing to the success of a cutting-edge concentrated solar power facility.

    This will close in 0 seconds

    Eskom


    Port Rex Peaking Station (East London):
    Replacement of Stacks

    This will close in 0 seconds

    Mpact


    Mpact

    Sodium Sulphate Plant – Piet Retief
    Complete Electrical & Instrumentation Installation

    Full-scope EC&I works, supporting the commissioning of a high-efficiency chemical processing facility:

    • Cabling:
      114 km of MV, LV, and control cable installed
    • Power Systems:
      Installation of MCCs, transformers, and generators
    • Electrical Fit-Out:
      Full lighting and small power systems
    • Instrumentation:
      Installation of process instrumentation

    A technically complex EC&I package delivered to specification, ensuring operational readiness for plant start-up.

    This will close in 0 seconds

    Mitsubishi Hitachi Power Systems


    Mitsubishi Hitachi Power Systems

    Kusile Power Station (Boilers and PJFF):
    Pre-Assembly & Erection of Boiler Structural Steel including on-site modifications, mechanical and electrical work.

    • 32 000 t of steel preassembled
    • 10 700 welds on 4 x PJFFs
    • LV electrical work
    • Scaffolding & Insulation

    This will close in 0 seconds

    GE


    Kriel Power Station (Kriel):
    Stator Repairs. Mechanical & Electrical work.

    Kusile WFGD (Kendal):
    Scope of work included the pre-assembly and installation of structural steel, installation of mechanical equipment, and cladding/sheeting.

    • Rope Access Technicians
      were utilized for torquing structural connections at height, reducing reliance on scaffolding and elevated mobile access platforms.
    • Quantities Installed:
      1,521 tons of structural steel
      4,463 m² of cladding
      22 mechanical equipment items
    • Modifications to the Absorbers (Unit 6):
      The roof was modified by cutting and removing deformations, followed by re-welding and Non-Destructive Testing (NDT).
      Arc strikes inside the tank were removed, surface scars repaired, and NDT performed.
    • The vertical and horizontal welds on the inside were ground to specification in preparation for internal rubber lining.

    This will close in 0 seconds

    Murray & Roberts


    Multi Petroleum Fuel Storage Facility (Heidelberg)
    Installation of Spiral Staircases and Diffuser Piping:

    • Spiral staircases were installed to 10no of fuel storage tanks in accordance with API 650
    • 500NB and 450NB Diffuser Pipes were installed inside the fuel storage tanks

    This will close in 0 seconds