Revolutionizing Industrial Infrastructure

With expertise in structural steel, mechanical, electrical, and piping installations, we power industries globally.

Leadership & Expertise

Driven by Excellence, Built on Integrity, Empowering Communities

Zero Harm. Zero Rework

Unconditional commitment to performance without compromise

Welcome to MEI Construction & Services (MEICS)

MEICS is a trusted leader in Mechanical and Electrical construction, proudly serving the Mining, Energy, Industrial and renewable energy sectors. Our reputation is built on a steadfast commitment to quality, safety, and reliability. With a proven track record of delivering projects safely and on time, we’ve earned the confidence of our clients by consistently exceeding expectations and setting new standards of excellence in every job we undertake.

Trust Our Experience To Keep Your Project On Track

Why Choose MEICS?

At MEICS, we don’t just build industrial infrastructure, we build confidence! Here’s what sets us apart:

Our executives are personally involved, ensuring our client’s vision is delivered with care

Lean and agile, we cut through complexity, reduce waste, and pass the savings in time and cost to clients

Fully integrated approach, coordinating interfaces that ensures progress moves smoothly and swiftly

We demonstrate performance before assuming entitlement.

CIDB Level 9 rating, the highest classification for construction capability in South Africa

ISO-accredited in Quality, Safety, Environmental Management, and Welding

Multiple safety awards recognized across the industry for excellence in high-risk operational activities

Proactive support of employment, procurement and upliftment in host communities

Level 1 BBBEE rating reflecting our commitment to diversity, inclusivity and transformation

Documents and Certificates

Available on request

Company Profile

CIDB Certificate

ISO Certificates

9001, 14001, 4500, 3834-2

Safety Awards

B-BBEE Level 1

SARS Compliance

Envusa Energy


240 MW Solar Plant
Project in joint venture with CEEC and CGGC

This will close in 0 seconds

EDF Renewables


115MW Solar Plant with BESS
Project in joint venture with CEEC and CGGC

This will close in 0 seconds

Tharisa


Tharisa
Comprehensive execution of SMPP and EC&I works on the Vulcan Plant that entailed

  • Structural Steel: 1,484 tonnes of steelwork detailed, fabricated and erected
  • Mechanical Installations: 265 major items
  • Piping:
    9 km of carbon steel and 8 km of HDPE piping
    63,700 dia. inches welded
    579 radiographic tests (RTs) with a repair rate of 0.7%
  • Electrical & Instrumentation:
    136 km of MV, LV and C&I cabling
  • Tanks:
    34 tanks (shop-fabricated and site-erected)
  • Support Works:
    Extensive Scaffolding and Thermal Insulation

This project required high-performance integration of mechanical and electrical disciplines, delivering fast track progress and quality at scale.

This will close in 0 seconds

Tronox


Tronox
SMPP works for a mineral sands plant in KZN.

This will close in 0 seconds

Thyssenkrupp


Thyssenkrupp
Thyssenkrupp
Comprehensive execution of critical inspection, fabrication, and installation works in a high-spec, hazardous environment:

  • Steelwork:
  • Piping Installation including welding,
    Post-Weld Heat Treatment (PWHT),
    Penetrant Tests (PT),
    Magnetic Particle Tests (MT),
    Radiographic Tests (RT),
    Hardness Verifications (HV).
  • Mechanical Scope:
    Installation of tanks and associated equipment
  • Support Services:
    Full Scaffolding and Thermal Insulation provision

A high-integrity turnaround project delivered with precision, safety, and uncompromising quality under strict statutory and environmental controls.

This will close in 0 seconds

Natref


Natref

Steam Boilers
SMPP and EC&I works for three new steam boilers at Natref refinery in Sasolburg

This will close in 0 seconds

Mogale


Mogale

Mogale

A full-scope SMPP and EC&I project, delivering critical infrastructure for a gold tailings retreatment plant:

  • Structural Steel:
    843 tonnes of steel detailed, fabricated and erected
  • Mechanical Installations:
    Full suite of process plant equipment. 503 items of mechanical equipment were installed.
  • Piping:
    20 km of carbon steel, stainless steel, and HDPE piping
  • Platework & Tanks:
    Precision-fabricated platework
    6 large tanks (shop- rolled plate and site-erected)
  • Electrical & Instrumentation:
    240 km of cabling (MV, LV, and C&I)
    Full installation of racking, cables, switchgear, and commissioning
  • Scaffolding &, Insulation and Heat Tracing:
    Safe access and thermal protection and preservation solutions

A turnkey delivery of a modern gold processing plant, built for reliability, scale, and long-term value in the gold mining sector.

This will close in 0 seconds

Impala Platinum


Impala Platinum
Flash Dryer No.8 – Rustenburg
Integrated Mechanical, Structural & Electrical Execution
End-to-end delivery of Structural, Mechanical, and Electrical & Instrumentation works for a modern dryer unit at Impala’s facility in Rustenburg:

  • Structural Scope:
    170 tonnes of steelwork fabricated and erected
    550-tonne silo: complete fabrication and site erection
  • Mechanical Works:
    Installation of all dryer-related mechanical equipment
  • Electrical & Instrumentation:
    Full MV, LV, and C&I installation

A turnkey execution combining steelwork, mechanicals, and integrated electrical systems in a high-demand processing environment.

This will close in 0 seconds

Foskor


Secondary Hoppers Reconstruction, Structural Recovery & Reinforcement for Safe Plant Restart

  • Emergency Response:
    Demolished and safely removed collapsed steelwork and platework caused by structural failure.
  • Accuracy:
    Detailed site measurements, followed by fast-track fabrication and installation of replacement structures to restore plant functionality.
  • Upgrades & Reinforcement:
    Identified and replaced additional corroded steelwork to eliminate safety risks and ensure long-term structural integrity.

A rapid, fast-paced recovery project executed to restore operations safely and minimize plant downtime.

This will close in 0 seconds

Sepcoiii


Sepcoiii

Redstone Concentrated Solar Plant – Postmasburg
Structural Execution for Next-Generation Renewable Energy Infrastructure

Erection of critical plant infrastructure for one of South Africa’s flagships CSP projects:

  • Steelwork:
    1,700 tonnes of structural steel erected
  • Piping:
    Pipe fabrication

A high-performance package contributing to the success of a cutting-edge concentrated solar power facility.

This will close in 0 seconds

Eskom


Port Rex Peaking Station (East London):
Replacement of Stacks

This will close in 0 seconds

Mpact


Mpact

Sodium Sulphate Plant – Piet Retief
Complete Electrical & Instrumentation Installation

Full-scope EC&I works, supporting the commissioning of a high-efficiency chemical processing facility:

  • Cabling:
    114 km of MV, LV, and control cable installed
  • Power Systems:
    Installation of MCCs, transformers, and generators
  • Electrical Fit-Out:
    Full lighting and small power systems
  • Instrumentation:
    Installation of process instrumentation

A technically complex EC&I package delivered to specification, ensuring operational readiness for plant start-up.

This will close in 0 seconds

Mitsubishi Hitachi Power Systems


Mitsubishi Hitachi Power Systems

Kusile Power Station (Boilers and PJFF):
Pre-Assembly & Erection of Boiler Structural Steel including on-site modifications, mechanical and electrical work.

  • 32 000 t of steel preassembled
  • 10 700 welds on 4 x PJFFs
  • LV electrical work
  • Scaffolding & Insulation

This will close in 0 seconds

GE


Kriel Power Station (Kriel):
Stator Repairs. Mechanical & Electrical work.

Kusile WFGD (Kendal):
Scope of work included the pre-assembly and installation of structural steel, installation of mechanical equipment, and cladding/sheeting.

  • Rope Access Technicians
    were utilized for torquing structural connections at height, reducing reliance on scaffolding and elevated mobile access platforms.
  • Quantities Installed:
    1,521 tons of structural steel
    4,463 m² of cladding
    22 mechanical equipment items
  • Modifications to the Absorbers (Unit 6):
    The roof was modified by cutting and removing deformations, followed by re-welding and Non-Destructive Testing (NDT).
    Arc strikes inside the tank were removed, surface scars repaired, and NDT performed.
  • The vertical and horizontal welds on the inside were ground to specification in preparation for internal rubber lining.

This will close in 0 seconds

Murray & Roberts


Multi Petroleum Fuel Storage Facility (Heidelberg)
Installation of Spiral Staircases and Diffuser Piping:

  • Spiral staircases were installed to 10no of fuel storage tanks in accordance with API 650
  • 500NB and 450NB Diffuser Pipes were installed inside the fuel storage tanks

This will close in 0 seconds